Ru

CHP-11

Usolye-Sibirskoye

Results in 2019

320.3 MW

installed power capacity

1,056.9 Gcal/h

installed heat capacity

The construction of the power plant began in 1954, and the first boiler and turbine were commissioned in 1959.
Key generating assets include: 7 turbo generators, 9 power-plant boilers.