Novo-Ziminskaya CHP

Sayansk

Results in 2019

260 MW

installed power capacity

818.7 Gcal/h

installed heat capacity

Construction of the plant began in 1972, and the first power plant boiler was commissioned in 1980.
Key generating assets include: 3 turbo generators, 4 power-plant boilers.