Results in 2019
320.3 MW
installed power capacity
1,056.9 Gcal/h
installed heat capacity
The construction of the power plant began in 1954, and the first boiler and turbine were commissioned in 1959.
Key generating assets include: 7 turbo generators, 9 power-plant boilers.